Up-date of existing system adding additional features
The new warehouse crane control system was to have all the same features as the existing solution, but it had to be based on a standard platform to ensure future support and expansion options. An automatic order system and a warehouse database were extra features to be added.
A final but main requirement was to reduce the implementation time of the new system as much as possible to prevent production downtime.
A new system based on standard Siemens TIA portal
To make sure that all existing features were included in the new warehouse crane control system, Eltronic A/S started out the project by thoroughly going over the existing system and preparing a requirement specification in cooperation with GLASSOLUTIONS. A Siemens TIA portal was selected to replace the existing PLC Siemens S5 solution, and a warehouse database and order execution system was designed to complement the new solution.
A transparent system with expansion possibilities
With the new warehouse crane control system designed by Eltronic A/S, GLASSOLUTIONS has received a flexible and easily expandable solution. The standard software makes it easy for GLASSOLUTIONS to get support for the system and add additional features and functionalities if required.
The integrated warehouse database and automatic order execution system mean that errors are reduced to an absolute minimum. In addition, operators previously occupied with order execution tasks can now be released for other assignments.
The new system allows GLASSOLUTIONS to generate reports and analyze data and thus spot potential improvement areas and reasons for crane downtime. In this way, warehouse operations have become more transparent.
Implementation in record time
When GLASSOLUTIONS first came to Eltronic A/S with the project, they expected an implementation time of about two weeks. Eltronic A/S initially estimated an implementation time of one week, but thanks to thorough preparational work and the ability to spot potential errors already in the design phase, Eltronic A/S was able to implement and test the new control system on-site in only three days.